Scope of Work:

Detailed Engineering, Supervision, Procurement, Installation, Testing, Commissioning and Start-up of an additional 17MW Power Block within the existing Halul Island Power Utility. The scope included 3 No. EGT 5.5MW Tempest Dual Fuel Gas Turbines, Oil Storage and Distribution, Gas Conditioning Plant, Gas Distribution, Turbine Washing System, Fire Detection and Protection Systems, Generator Transformers, Emergency Generator, 132kV GIS Switchgear, 11kV Switchgear, 415V MCCs, Control Room Equipment and Field Instrumentation. The Scope also included the complete Civil and Building Works. The Contract was awarded on a Turnkey basis.